Summerhill Lodge
837
wp-singular,portfolio_page-template-default,single,single-portfolio_page,postid-837,wp-theme-bridge,wp-child-theme-bridge-child,bridge-core-3.0.1,qode-page-transition-enabled,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode-title-hidden,transparent_content,qode-child-theme-ver-1.0.0,qode-theme-ver-28.7,qode-theme-bridge,disabled_footer_bottom,wpb-js-composer js-comp-ver-6.8.0,vc_responsive
Category
Healthcare
About This Project

Summerhill Lodge

A two-storey former workhouse master’s house, built in 1841, Summerhill Lodge is set within an elevated site and visible throughout Carrick-on-Shannon. Recognising the social and historical significance of the building due to its former role, VHA was appointed to bring forward and deliver an adaptive building for healthcare services.